Tender Details
| Tender ID | Tender2087 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Reference No. | TendersTime2087 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tender Brief | NTPC Tender 2026: Skill Development Training / O&M Tender Details, Eligibility, EMD, Tender Fee & Bid Submission Guide. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tender Description | Check NTPC Tender 2026 details including eligibility, qualifying requirements, EMD, tender fee, bid submission process, document checklist, pre-bid status and important tender dates. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Pre-Qualification Criteria Tender Summary Table
Scope of Work Important qualification regarding the scope The uploaded PDF is principally an Instructions to Bidders document for O&M Works. It refers bidders to Section V – Technical Specifications and Bid Drawings for technical and scope-related requirements. The package-specific Section-I (IFB/NIT) and the complete package-specific technical scope are not available in the supplied document. Accordingly, SkillCouncils.com should not publish a specific Machine Operator (Plastics Processing) training scope as if it were confirmed by this PDF. The document establishes that the bidding documents ordinarily comprise:
The ITB specifically instructs bidders to examine all instructions, forms, terms, conditions and specifications before submission. O&M-related scope framework The document requires the successful bidder to execute the work in accordance with the applicable bidding documents, technical specifications, BOQ and contractual conditions. It also places responsibility on bidders to understand site conditions, risks and circumstances affecting execution. For the website, the appropriate wording is: The detailed scope of work, technical specifications, quantities, deliverables, manpower requirements and execution conditions should be read from the applicable Section-I/IFB and Section-V Technical Specifications of the original NTPC tender. These package-specific sections are not included in the supplied PDF. Professional Qualification Criteria A significant point in the supplied Special Conditions of Contract (SCC) is that: “Qualification Requirements for Bidders: Not Applicable.” Therefore, the document does not prescribe a specific minimum turnover, net worth or minimum past-experience threshold for bidder qualification. However, the ITB contains a general framework requiring documentary evidence of qualifying requirements where such requirements are specified in the NIT/IFB. For example, the ITB refers to Work Orders, Purchase Orders, Letters of Award, Contract Agreements and client/completion certificates as supporting evidence where applicable. The document also states that bidders must accept the relevant online General Technical Evaluation conditions relating to compliance with the Qualifying Requirements. Professional qualification summary
Eligibility Criteria The ITB contains provisions concerning Preference to Make in India and Eligibility for Participation. The document states that, for the applicable procurement provisions, Class-I Local Suppliers are eligible to participate. Bidders are required to provide the required declaration regarding local content and comply with the applicable Public Procurement (Preference to Make in India) provisions. The ITB also contains restrictions concerning procurement from bidders from countries sharing a land border with India, where applicable. Other important eligibility/compliance requirements Bidders must also comply with:
The ITB requires bidders to confirm full compliance with the bidding documents through the online General Technical Evaluation process. Financial Criteria The supplied SCC states that Qualification Requirements for Bidders are Not Applicable. Therefore: Minimum Average Annual Turnover Not specified / Not Applicable in the supplied document. Net Worth Not specified / Not Applicable in the supplied document. Minimum Financial Experience No separate financial experience threshold is prescribed in the supplied SCC. However, the ITB states that where financial criteria are specified in the NIT/IFB, bidders may be required to submit audited financial results for the preceding three financial years or certified Balance Sheet and Profit & Loss statements. A solvency certificate may also be required if specifically requested in the NIT/Tender Enquiry. Tender Fee and EMD The Special Conditions of Contract clearly state: Bid Security / EMD Not Applicable Tender Fee Not Applicable Consequently, there is no EMD amount or EMD payment mode to report for the supplied version of the tender. This is an important distinction from the general ITB provisions. The generic ITB explains different possible bid-security mechanisms, including EFT, e-BG and Insurance Surety Bond, but the package-specific SCC overrides those generic provisions by specifying “Bid Security / Guarantee / Earnest Money & Tender Fee: Not Applicable.” Therefore, SkillCouncils.com should publish: EMD: Not Applicable rather than attempting to calculate an EMD amount. Bid Submission Guidelines The ITB establishes an electronic tendering procedure through the NTPC e-Procurement Portal. The tender can be viewed at: The Bid Form is required to be completed and digitally signed using a Class II/III Digital Signature, along with the applicable attachments. The bid includes the techno-commercial component and price bid. Techno-Commercial Bid The techno-commercial bid should contain the required technical and commercial documents. Importantly, the ITB states that: The Techno-Commercial Bid should not contain any price content. Any price information found in the techno-commercial bid may result in rejection. Price Bid The bidder is required to complete the applicable BOQ and upload the filled BOQ in the Finance Cover/Envelope on the portal. The BOQ template should not be modified or replaced. Important submission points Bidders should:
The ITB also warns that incomplete attachments or information such as “shall be given later” may result in rejection. Document Checklist for Bidders The following checklist is derived from the ITB and should be used as a pre-submission checklist, subject to the package-specific NIT/IFB.
The ITB identifies, among other things, the authority-to-sign documents, bidder qualification documents, financial records, work-execution evidence, equipment deployment schedule, general declaration, EFT authorisation, PF/ESI/PAN/GSTIN information, GST declaration and technical compliance documents. Important Tender Dates The supplied PDF does not provide the actual NIT/IFB schedule. Therefore, the following dates should be displayed as “Not stated in supplied document” rather than being estimated.
The SCC specifically records “Pre-Bid Conference – Not Applicable” and “Bid Security / Guarantee / Earnest Money & Tender Fee: Not Applicable.” The general ITB states that where a pre-bid conference is specified in the NIT, bidder queries are normally required in writing before the conference, and non-attendance itself is not a cause for disqualification. This general provision does not change the package-specific SCC indication that the pre-bid conference is not applicable here. Estimated Cost Estimated Cost: Not stated in the supplied document. The document directs bidders to Section-I (IFB) for package-specific information. Since that section is not included in the supplied PDF, no estimated contract value should be published as a confirmed figure. For a public-facing SkillCouncils.com listing, the recommended entry is: Estimated Tender Value: Not disclosed/stated in the supplied bidding document. Please refer to the original NTPC NIT/IFB for the package-specific value. Bid Validity The tender documentation specifies a bid validity period of 120 days. The ITB states that the bidder is required to keep its bid valid for 120 days from the date of opening of the techno-commercial bid, unless a different period is specified in the SCC. Key Compliance Points for Bidders 1. No price in the technical bid Price information should be confined to the Price Bid/BOQ. 2. No deviation The ITB contains a Nil Deviations requirement. Bidders are expected to accept the bidding documents without deviations. 3. Complete documentation Leaving mandatory attachments blank or providing information later may result in rejection. 4. Verify corrigenda Bidders should regularly check the NTPC e-tender portal for amendments, clarifications and corrigenda before submitting the bid. 5. Digital signature The Bid Form is required to be digitally signed using the prescribed digital signature. 6. Correct qualification evidence Where a qualifying requirement is specified in the applicable NIT/IFB, bidders must provide documentary evidence. The ITB specifically refers to authentic Work Orders, Purchase Orders, Letters of Award, Contract Agreements and client certificates as supporting evidence. 7. Technical compliance Bidders must confirm compliance with the applicable technical specifications and scope of work. Tender Expert's Assessment From a tender-compliance perspective, the most important issue with the supplied document is document completeness. The PDF contains the general ITB and SCC framework but does not contain the package-specific Section-I – Invitation for Bids/NIT/Tender Enquiry, which is the section that the document itself identifies as the source for several critical tender particulars. Therefore, the following information cannot be responsibly confirmed from the supplied PDF:
For public publication, these fields should be updated after checking the original NTPC Section-I/IFB/NIT or the corresponding NTPC e-Procurement Portal tender page. Consultation & Advisory For consultation and advisory services, please call or WhatsApp: 9630030343 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Minimum Average annual Turnover | Not Specified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Net Worth | Not Specified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Minimum Experience | Not Specified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Submission Mode | Online | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| EMD Exemption | Not applicable | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Tender Fee (Number) | Not Applicable | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| EMD (Number) | Not Required | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Mode of EMD | Not Applicable | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Estimated Cost | Not specified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Start Date of Document Collection | Not mentioned | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Pre-Bid Meeting Date | Not Specified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last Date for Submission | 30 September 2026, | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opening Date | Not Specified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Download the Document | View Document | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Enquire Now


rcial opening date 
